ECHO Robotics – Dimensioning Tool
1
Fill in Input Data for all parcels
2
Go to Proposal tab, define robots & assign parcels
3
Check Results – adjust if reserve is negative

🏌️ Project Information

💡 Tips & Tricks:   The surface of a Rough around Fairway must include the Fairway area.  |  Use Google Earth to measure parcel data.  |  We recommend cutting Fairways minimum 4×/week.  |  If path length is unknown, use 50 m as indication.  |  Do not delete rows – clear their content instead.

⚡ Field Type Efficiency Reference

▲ Hide

The cutting performance factor reflects how efficiently a robot mows each field type relative to its rated output. It is applied to the surface mowing time: Surface time = Area ÷ (Robot perf. × Field factor) × (1 + Safety factor)

Field Type Cutting Performance Factor Effective perf. TM-850 [m²/h] Effective perf. TM-1050 [m²/h] Effective perf. TM-2050 [m²/h]
Grassfarm 1.00 735 800 1340
Driving range 0.96 706 768 1286
Sportsfields 0.87 639 696 1166
Tee 0.75 551 600 1005
Fairway 0.75 551 600 1005
Rough 0.80 588 640 1072
Rough around FW dynamic * — — —
Model Base perf. [m²/h] Border speed [m/s] GPS speed [m/s] Safety factor Border charge factor Path charge factor Mow width [m]
TM-850 735 0.8 0.8 5% 0.9400 0.2000 0.42
TM-1050 800 0.58 0.6 5% 0.4722 0.3333 0.63
TM-2050 1340 0.6 0.8 5% 0.9444 0.2000 1.2

* Rough around FW: efficiency is estimated dynamically using a regression model based on the ratio of the rough area to the fairway area (formula: factor = 0.0638 × (A_rough / A_fairway) + 0.5777, clamped to [0.45 – 0.85]).

📋 Parcel Input Data

0 parcels
Name i
Field Type i
Area [m²] i
Perimeter [m] i
Path [m] i
Cut freq/week i
Avail. time [h/day] i
Stepcut width [m] i
Assoc. Fairway i
Real Area [m²] i
Real Perim. [m] i
Stepcut Area [m²] i
100–
200–
300–
400–

🤖 Define Robots

Robot ID Model
Robot Models:
TM-850: 735 m²/h – compact, ideal for narrow roughs
TM-1050: 800 m²/h – versatile all-rounder
TM-2050: 1340 m²/h – high performance for large fairways

🗺️ Assign Robots to Parcels

Robot ID Model Parcel Name Field Type
Efficiency factor i
Area [m²] Stepcut passes Stepcut length [m] Total surf. (incl. stepcut) [m²]
–––––––

📊 Results per Robot

–
Robot ID Model
Total Surface [m²] i
Surf. incl. Stepcut [m²] i
Time 1 cut [h] i
Cut time/week [h] i
Max avail./week [h] i
Reserve/week [h] i
% Capacity i
Status
Define robots and assign parcels to see results.

📝 Remarks & Notes