1
Fill in Input Data for all parcels2
Go to Proposal tab, define robots & assign parcels3
Check Results – adjust if reserve is negative🏌️ Project Information
💡 Tips & Tricks:
The surface of a Rough around Fairway must include the Fairway area. |
Use Google Earth to measure parcel data. |
We recommend cutting Fairways minimum 4×/week. |
If path length is unknown, use 50 m as indication. |
Do not delete rows – clear their content instead.
⚡ Field Type Efficiency Reference
▲ Hide
The cutting performance factor reflects how efficiently a robot mows each field type relative to its rated output.
It is applied to the surface mowing time: Surface time = Area ÷ (Robot perf. × Field factor) × (1 + Safety factor)
Field Type Factors
| Field Type | Cutting Performance Factor | Effective perf. TM-850 [m²/h] | Effective perf. TM-1050 [m²/h] | Effective perf. TM-2050 [m²/h] |
|---|---|---|---|---|
| Grassfarm | 1.00 | 735 | 800 | 1340 |
| Driving range | 0.96 | 706 | 768 | 1286 |
| Sportsfields | 0.87 | 639 | 696 | 1166 |
| Tee | 0.75 | 551 | 600 | 1005 |
| Fairway | 0.75 | 551 | 600 | 1005 |
| Rough | 0.80 | 588 | 640 | 1072 |
| Rough around FW | dynamic * | — | — | — |
Robot Model Specifications
| Model | Base perf. [m²/h] | Border speed [m/s] | GPS speed [m/s] | Safety factor | Border charge factor | Path charge factor | Mow width [m] |
|---|---|---|---|---|---|---|---|
| TM-850 | 735 | 0.8 | 0.8 | 5% | 0.9400 | 0.2000 | 0.42 |
| TM-1050 | 800 | 0.58 | 0.6 | 5% | 0.4722 | 0.3333 | 0.63 |
| TM-2050 | 1340 | 0.6 | 0.8 | 5% | 0.9444 | 0.2000 | 1.2 |
* Rough around FW: efficiency is estimated dynamically using a regression model based on the ratio of the rough area to the fairway area
(formula: factor = 0.0638 × (A_rough / A_fairway) + 0.5777, clamped to [0.45 – 0.85]).
📋 Parcel Input Data
0 parcels|
Name
|
Field Type
|
Area [m²]
|
Perimeter [m]
|
Path [m]
|
Cut freq/week
|
Avail. time [h/day]
|
Stepcut width [m]
|
Assoc. Fairway
|
Real Area [m²]
|
Real Perim. [m]
|
Stepcut Area [m²]
|
||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 0 | 0 | – | ||||||||||
| 2 | 0 | 0 | – | ||||||||||
| 3 | 0 | 0 | – | ||||||||||
| 4 | 0 | 0 | – |
🤖 Robot Definitions
| Robot ID | Model | Performance [m²/h] |
|---|---|---|
| No robots defined yet. | ||
🤖 Define Robots
| Robot ID | Model | |
|---|---|---|
Robot Models:
TM-850: 735 m²/h – compact, ideal for narrow roughs
TM-1050: 800 m²/h – versatile all-rounder
TM-2050: 1340 m²/h – high performance for large fairways
TM-850: 735 m²/h – compact, ideal for narrow roughs
TM-1050: 800 m²/h – versatile all-rounder
TM-2050: 1340 m²/h – high performance for large fairways
🗺️ Assign Robots to Parcels
| Robot ID | Model | Parcel Name | Field Type |
Efficiency factor
|
Area [m²] | Stepcut passes | Stepcut length [m] | Total surf. (incl. stepcut) [m²] | |
|---|---|---|---|---|---|---|---|---|---|
| – | – | – | – | – | – | – |
📊 Results per Robot
–| Robot ID | Model |
Total Surface [m²]
|
Surf. incl. Stepcut [m²]
|
Time 1 cut [h]
|
Cut time/week [h]
|
Max avail./week [h]
|
Reserve/week [h]
|
% Capacity
|
Status |
|---|---|---|---|---|---|---|---|---|---|
| Define robots and assign parcels to see results. | |||||||||